HVAC change orders often exceed $5,000+
Issues identified late typically cost significantly more once construction has started
American Execution. German Precision. Exceptional Building Performance
Yours doesn’t have to! HVAC should support your project — not destabilize it.
We eliminate HVAC-related schedule, budget and coordination risks before construction starts. We take the responsibilty for the gap between Design and Execution.
These are not execution problems. It's preventable planning gaps.
We validate the HVAC system before construction starts — not during it. Routing, elevations, and equipment are fully defined early, so approvals and procurement move without delays.
You don’t have to chase the engineer or coordinate between trades – we handle that interface with implementation planning.
So your schedule stays under control
We turn an undefined HVAC scope into a clearly priced system before construction.
By defining layout, equipment, and scope gaps early, costs become predictable instead of reactive.
You get a system that can be priced reliably – not one that evolves during construction.
So you avoid change orders
We take ownership of the interface between design and execution.
We translate design into a buildable system and resolve issues before they hit the field — not after.
You don’t have to coordinate between engineer and subcontractor – we take ownership of that interface, instead of managing conflicts.
So you don't carry the risk
HVAC Implementation Planning bridges the gap between engineering design and construction.
It ensures that HVAC systems are fully coordinated, buildable, and ready for execution before fabrication and installation begin.
Issues identified late typically cost significantly more once construction has started
Depending on project phase, access and schedule impact
regularly you carry the risk
Schedule. Budget. Coordination. Controlled
We perform a comprehensive buildability assessment of your entire HVAC project. Every floor, every system and every major coordination interface is reviewed to create a complete project-wide risk picture before fabrication begins
starting at, based on project scope
Order after Issued-for-Construction (CD) drawings are available
What's included:
Comprehensive project-wide HVAC review
Result:
Athe the end of this phase:
You know exactly where your HVAC system is ready for construction — and where unresolved risks could become costly field problems if left unchanged
Deliverables:
We transform your HVAC design into a fully coordinated, buildable system and keep it buildable as your project evolves. Through structured BIM coordination, clash resolution and continuous implementation support, we eliminate field conflicts before they impact your schedule, budget or installation. As designs change, we continuously validate and update the HVAC system to maintain constructability throughout preconstruction
starting at, based on project scope
Order this BEFORE fabrication and throughout the preconstruction phase
What's included:
Initial Implementation Planning
Ongoing Implementation Support
Result:
At the end of this phase
Your HVAC system remains coordinated, buildable and fabrication-ready throughout the entire preconstruction process — even as the project evolves
Deliverables:
We become your HVAC implementation advisor before critical design decisions are locked in. Working alongside the General Contractor, Owner and Engineer of Record, we validate design strategies, identify execution risks and provide constructability guidance throughout the design process. Our role is to ensure today's design decisions remain practical, buildable and aligned with successful construction tomorrow
starting at, based on project scope
Engage this service during Schematic Design, Design Development or early Construction Documents
What's included:
Strategic HVAC Advisory
Result:
At the end of this phase:
Your project enters implementation with an HVAC strategy that has been technically challenged, validated and aligned across all key stakeholders before major commitments are made
Deliverables:
Experience supporting projects involving European and North American project teams
You know where the risks are
You eliminate those risks
You prevent those risks
Why GC's Choose AGE Design & Build
AGE Design & Build provides Implementation-level HVAC Planning & Coordination in Charlotte, NC. We are baked by real engineering logic, German technical thinking and U.S. constructability experience. We are a technical team with German roots and a clear focus: technical precision, long-term solutions and genuine partnerships - human to human with German Knowhow Specialists
Our background is built on more than 100 commercial HVAC projects in Germany. This experience is now applied in the U.S. market, where we provide our Design Assist for General Contractors and Mechanical Contractors.
We are not a BIM Company. BIM is only one part of it. Our Value is engineering-based HVAC understanding and real-world constructability!
Quality leadership through German discipline combined with deep U.S. knowledge
Coordination support that prevent costly errors - ensuring quality from day one
Direct answers, accountable reporting - no delays, no excuses
Conflicts solved early - efficiency protected, value secured
Systems that work as promised over decates
highly quality Building systems for efficiency, longevity and comfort
Because, great building systems are built long before installation begins
We eliminate field coordination by delivering a fully coordinated HVAC layout before installation starts. We resolve routing, elevations and spatial conflicts against structure and other trades – before anything reaches the field.
You get a system that installs cleanly. You don’t have to coordinate between trades on site – we resolve those conflicts before installation begins
At AGE Design & Build, we believe that qualityis never an accident. True building performance starts long before the first duct is installed - with precise coordination, clear communication and the Knowhow of German engineer Thinking.
Our method is simple: solve problems before they happen. Because in the end, it's not just about finishing a project - it's about delivering Exceptional Building Performance
American Execution - German Precision - Exceptional Building Performance
We operate in the critical gap between design and construction – translating design intent into buildable, coordinated systems and ready for execution - not just BIM
We focus exclusively on repeatable, HVAC driven commercial projects:
Conflicting use requirements, interface risk between Industrial and Mixed Use complex system coordination
Tight ceiling spaces, dense HVAC coordination and schedule-driven tenant improvements.
High code requirements, critical HVAC zoning and zero tolerance for coordination errors
I'm doing this because after more than 12 years in the HVAC and MEP industry, I'm still frustrated to see the same problems repeated across so many projects: budget overruns that reduce profit or delays that wreck any schedule and hold up the entire project. In my opinion, these shouldn't be the standard, as I have experiencedd firsthand, year after year, that things can be approached differently. For this reason, I founded AGE Design & Build, to combine American execution with German precision and create more Value impact!

Thorsten Peter, Founder of AGE