At AGE Design & Build, we don't just support you - we translate design intent into buildable HVAC solutions, optimized for performance, efficiency and longevity - with German precision and U.S. construction knowhow

Hero Banner

HVAC becomes a scheduling risk due to technical ambiguities between planning and implementation. Shop drawings go through multiple stages, equipment is ordered too late, and project managers are essentially putting out fires.

We close the gap between planning and feasibility. By validating routing, elevations, and equipment selection early on, we reduce HVAC-related schedule risks and enable faster approvals and reliable procurement.

HVAC related change orders often exceed $5,000

Issues identified late typically cost significantly more once construction has started

Complex Coordination issues can easily cost $2,000–$25,000 per conflict

Depending on project phase, access and schedule impact

Reduced RFIs and faster project execution

Clear coordination decisions reduce delays and keep projects on schedule.

Our Vision

Our Vision is to become the quality leader in the U.S. market by delivering building systems that are precisly engineered-based, flawlessy executed and built to last.

We believe that building systems define the true performance of a property. Our German Approach means thinking ahead, precisely implementation and taking full responsibility for quality and results.

We combine German precision in Implementation Planning & Design Assist Collaboration with American execution. From day one, our focus is on responsibility and reliablity.

We provide implementation-level HVAC planning & coordination - All BIM based

germanapproach_hvacroof

American Execution. German Precision. Exceptional Building Performance

That's not just our claim - it's our promise

So many people ask me, "Hey Peter, why are you doing this?"

I'm doing this because it frustrates me that most construction projects these days are too expensive, take too long and create so much pressure that you can't build anything and you have to meet the deadline. I know it can be done differently, I know you can meet deadlines if you approach it with the right strategy, the right partners and the right motivation. That's why I founded AGE Design & Build. Because I want to show that it can be done better, more effectively and more cheaply!
A Image of the Founder

Peter, Founder of AGE

 

Minimize HVAC-Related Risk at Every Project Stage

Schedule. Budget. Coordination. Controlled

HVAC Implementation Planning - Constructability First

We help General Contractors and Developers make HVAC systems buildable – long before they turn into RFIs, field conflicts or change order. This is where we bring real HVAC system logic, constructability thinking and real-world execution knowledge into the project

What's included:

  • Logical review of airflow, equipment locations & system zoning
  • Constructability & installation feasibility checks
  • Early conflict analysis in ceiling spaces (HVAC vs. structure vs. MEP)
  • Access & serviceability review (maintenance paths, door clearances, etc.)
  • Routing strategy (high-level) for ducts/pipes in congested areas
  • Review of missing or unclear information in the permit set
  • Technical risk report (code gaps, inconsistencies, coordination risks)

Result:

  • Clear Go/no-Go decision framework for shop drawing release
  • Identified risks impacting procurement and long-lead equipment
  • Minimizes late-stage coordination delays
  • Increased schedule predictability before fabrication

Deliverables:

  • HVAC Implementation Risk Summary report (PDF)
  • 1 Example Plan with annotated comments / redlines to the Engineer-of-Record design
  • Recommended next steps for GC and MEP trade

 

HVAC Coordination & Conflict-Free Planning - BIM based

We transform HVAC design intent into a fully coordinated, installation-ready system — protecting your project from costly field conflicts, change orders, and schedule disruption.

Through structured BIM coordination and disciplined clash resolution, we eliminate uncertainty before installation begins.
BIM is not the product. Budget and schedule stability are.

What's included:

  • All from HVAC Implementation Planning
  • BIM model integration
  • 3D coordination of HVAC
  • Clash detection & documented resolution to prevent field rework
  • Ceiling-space coordination & height management
  • Detailed routing aligned with ceiling constraints and trade priorities to avoid field modifications
  • Consolidated model updates (weekly or milestone-based)
  • Support for Submittals & Shop Drawings
  • Coordintation decisions documented to support cost clarity and procurement alignment
  • Issue management via ACC/Revizto (optional)

Result:

  • Resolved clashes before field installation
  • Minimized likelihood of change orders caused by coordination gaps
  • Increased cost predictability and installation efficiency
  • Budget & Schedule stability for GC

Deliverables:

  • Coordinated 3D HVAC model integrated wtih MEP
  • Clash report + issue list (PDF) (if it's even still needed)
  • Routing & installation-ready layouts for trades with final coordination package for GC, HVAC and MEP subcontractors

 

HVAC Design Assist - Early Risk & Performance Control - BIM based

We intervene early in the design phase to prevent HVAC decisions that later create cost overruns, coordination conflicts, or performance issues.

Working alongside the Engineer of Record, we validate system strategy, space requirements, and constructability before design assumptions become contractual constraints.

This reduces redesign cycles and technical uncertainty before construction.

What's included:

  • All from HVAC Implementation Planning and HVAC Coodinatino Packages
  • Early HVAC system strategy review and type evaluation (VRF, RTU, AHU strategy)
  • Feasibility studies (space constraints, ceiling congestion, routing logic)
  • Constructability recommendations for Engineers & GCs
  • Technical design questions resolved early
  • Collaboration with the Engineer of Record (non-PE scope)
  • Clear decision points for GC & EOR
  • Early coordination with other trades (MEP)
  • BIM workflows based Budget-impact
  • Implementation-level for HVAC
  • Planning and system integrator with German knowhow
  • Bridge the gap between planning permission and construction reality

Result:

  • Reduced likelihood of major HVAC redesign during construction
  • Increased confidence in system performance and space feasibility
  • Early alignment between GC, Engineer and MEP trades
  • A validated HVAC system strategy ready for execution planning

Deliverables:

  • Design Assist Reports with system insights & recommendations
  • Early coordination model, HVAC integrated with other Trades
  • Coordination workshops & meetings
  • Meeting notes & issue tracking
  • A ready-made package for execution
  • Optional ACC or Revizto project setup + coordination structure

 

Discuss your current HVAC challanges.

A focused 30-minute technical conversation. For active commercial projects

Construction costs frequently exceed the planned budget due to unresolved technical details between planning and execution. Incomplete HVAC planning leads to change orders, additional work, and late material adjustments, directly impacting margins and cost certainty.

We reduce HVAC-related budget risk by closing planning and coordination gaps before they turn into change orders or cost overruns.
Through structured implementation and coordination validation, we improve cost transparency, minimize rework, and increase financial predictability for the General Contractor.

Our German Expertise

What We bring to Your Project?

We offer our German-engineered based Knowhow for

  • Medical Office/Buildings
  • Offices
  • Mixed-Use

Excellence Before the Jobsite

Our goal is simple: do it right the first time - before it costs you money.

The disciplined approach ensures projects run on time, on budget and without surprises.

For Example, this weather protection grille is perfect sized, designed last for decades. 

This is German Precision - small differences that save big money, because it holds for decades

 

germanapproach_wsg

Our Role in the Building Process

We operate at the critical interface between design and construction – translating design intent into buildable, coordinated systems and ready for execution - not just BIM

Medical Office/Buildings

High code requirements, critical HVAC zoning and zero tolerance for coordination errors.

Offices

Tight ceiling spaces, dense HVAC coordination and schedule-driven tenant improvements.

Mixed-Use

Conflicting use requirements, interface risk between office and retail and complex system coordination

Collaboration is KEY

AGE Design & Build provides Implementation-level HVAC Planning & Coordination. We are baked by real engineering logic, German technical thinking and U.S. constructability experience. We are a technical team with German roots and a clear focus: technical precision, long-term solutions and genuine partnerships - human to human with German Knowhow Specialists

Our background is built on more than 100 commercial HVAC projects in Germany. This experience is now applied in the U.S. market, where we provide our Design Assist for General Contractors and Commercial Developers.

As Engineers in Germany, we believe in more than short-term fixes. Reliability, accountability and earned trust are the foundation of every client relationship. Our work combines German engineering discipline with U.S. expertise, creating clarity and certainty in your project.

Today, we share this expertise with general contractors and commercial developers - pragmatic, solution-driven and always focused on reducing risk!

portrait_Founder

German Precision + US Expertise

Quality leadership through German discipline combined with deep U.S. knowledge

Coordination Support Before Build

Coordination support that prevent costly errors - ensuring quality from day one

Fast and Responsible Communication

Direct answers, accountable reporting - no delays, no excuses

On Budget. On Schedule. Every Time

Conflicts solved early - efficiency protected, value secured

Reliable and Predictable Outcomes

Systems that work as promised over decates

Exceptional Building Performance

highly quality Building systems for efficiency, longevity and comfort

Critical HVAC decisions are often made early without fully validating constructability, space constraints, or budget impact. Incorrect assumptions later result in redesign, change orders, and performance issues


We validate HVAC system strategy, spatial requirements, and key technical assumptions early — before they become contractual constraints.

Through structured design-assist integration, we reduce redesign cycles, minimize later change orders, and increase cost and schedule predictability.

Get your free Coordination Check in 3 Simple Steps

1.
Contact Us
Tell us about you and your project
2.
Upload a PDF Floor plan
Give us important specifications
3.
PDF + Video Call
Summary report
What's included:
rapid risk analysis, 3-5 specific findings from the permit set, ceiling/routing conflict check, potential schedule risks and missing data detection
 
Get your free coordination Check